Remove Flooring Systems Remove Historic Preservation Remove Real Estate Development
article thumbnail

TAT Revitalizes Derelict Office Building in Springfield, Mass.

CCR Magazine

Once a premier office building and later serving as a major regional hotel and theater, the historic structure sat vacant and derelict for three decades at a prominent location in downtown Springfield. s Court Square neighborhood and setting the stage for the city’s long-term economic growth.

article thumbnail

Adaptive reuse: 5 benefits of office-to-residential conversions

BDC Network

Any conversion project requires critical consideration of the existing building conditions: the size of the floorplate, the placement of the building on the block, the viability of the MEP systems, even the condition of the window. The marble-clad lobby at Millennium on LaSalle was preserved and reconditioned.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

2023 BALA Winners: The Best of the Best

The Pro Builder

Floor-to-ceiling glass at the entry and along the length of the back façade blur the line between interior and exterior and frame views of the courtyard water feature at the front and the deck and landscaped yard at the back. PHOTOS: JM Real Estate Media Transforming a charming yet dated 1940s adobe home in Tucson, Ariz.,

article thumbnail

2 Hudson Square: A New Landmark in New York City’s Architectural Landscape

Construction Daily News

The development of 2 Hudson Square marks a significant milestone in the transformation of the Hudson Square area into a vibrant mixed-use destination. With its strategic location and innovative design, the development is expected to attract a mix of tenants looking for modern office spaces.

article thumbnail

When office-to-residential conversion works

BDC Network

Structures built since the mid-20th century generally feature large, deep floor plates whose cores are far from where natural light and fresh air could travel. Adding to the complication is an office building’s inner core, which typically contains multiple elevators, public bathrooms, and mechanical rooms on every floor.

article thumbnail

Venyu Solutions Opens Tier III Data Center In Shreveport

Business Facilities

Venyu Solutions LLC has completed its new Tier III data center – the highest certification for any data center in Louisiana – following the historically faithful $20 million preservation of the former Selber Bros. Louisiana Economic Development (LED) estimates the project will result in another 19 new indirect jobs.

article thumbnail

4 Inspiring Adaptive Reuse Projects With Real Impact

The Pro Builder

Honoring the past while giving new life to a structure—and with it, often an entire neighborhood—requires creative thinking to successfully meld modern codes with preservation goals. Builder and developer: Armada Hoffler Construction, Virginia Beach, Va. Developer: Svigos Asset Management, Buffalo Grove Size: 38,850 sf No.