Remove Flooring Systems Remove HVAC Systems Remove Steel Fabrication Remove Wall Systems
article thumbnail

FHSU Forsyth Library Renovation

The MCP Group

Location Hays, Kansas Plans FHSU Forsyth Library Renovation Combined Plans Specifications FHSU Forsyth Library Renovation Combined Specifications General Information Bid Invitation FHSU Forsyth Library Renovation MCP Supplemental Conditions.2021 2021 Addenda ADD 1 The post FHSU Forsyth Library Renovation appeared first on MCP GROUP.

article thumbnail

Wyndham Echo Round Rock, TX

The MCP Group

Bid Due Date | February 20, 2024 12:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Echo Suites – Pasadena, TX

The MCP Group

Bid Due Date | August 31, 2023 2:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)

article thumbnail

Echo Suites – Fort Worth, TX

The MCP Group

Bid Due Date | July 19, 2023 2:00 PM Project Description New Construction of a 4 story wood framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)

article thumbnail

Echo Suites – Fort Worth, TX

The MCP Group

Bid Due Date | July 19, 2023 2:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)

article thumbnail

Renovation Trends in Material Selection for Sustainable Homes

Construction Daily News

To ensure that conditioned air does not escape through cracks in the window-to-wall transitions, it is important to choose the most high-quality window solutions. Fabricated from a mixture of cement, sand, cellulose fibers, and other weather-resistant additives, fiber cement is one of the most long-lasting siding products on the market.

article thumbnail

MODLOGIQ Installs North America’s Largest Modular Healthcare Site

CCR Magazine

MODLOGIQ , the leader in SMART OFF-SITE CONSTRUCTION, has begun transport and installation of the more than 200 modules that comprise the Athens Medical Campus—less than 12 months after fabrication began. The completed project will be the largest permanent healthcare facility in North America built using off-site modular construction.