Remove Flooring Systems Remove Masonry Remove Roofing Systems
article thumbnail

Additional practical insights on overcladding masonry facades

Construction Specifier

This is a follow-up article speaking to additional questions in this system type. The topics to be addressed in this article, when it comes to overcladding masonary facades and foundations, as well as roof assemblies, include the following: Placement and attachment of insulation and air barrier within the assembly.

Masonry 52
article thumbnail

Adair County Awarded Preserve Missouri 2024 Project of the Year Project with Veregy

Civil + Structural Engineer

renovation project integrated energy-efficient systems into the 126-year-old courthouse structure, reducing energy consumption while maintaining the building’s historical integrity. Innovative Solutions Driving Sustainable Success The $8.1M

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Overcladding for old masonry façades: why it is important to think performance first

Construction Specifier

Older masonry structures from many eras, including libraries, town halls, commercial blocks, and school buildings, stand at the geographic center of many communities, holding symbolic meaning and serving varied needs and purposes. Photos courtesy RKTB Architects. By Albert Aronov, AIA. What is Overcladding?

Masonry 52
article thumbnail

ESU Nursing & Student Wellness Center

The MCP Group

Location Emporia, Kansas Plans ESU Nursing & Student Wellness Center Combined Plans Specifications 014518 Specification Vol 1 014518 Specification Vol 2 General Information Bid Invitation ESU Nursing & Student Wellness Center MCP Supplemental Conditions.2021

article thumbnail

KHRC Office Remodel

The MCP Group

Location Topeka, Kansas Plans KHRC Office Remodel Combined Plans Specifications _23024-KHRC-INSTRUCTIONS TO BIDDERS _23024-KHRC-PROJECT MANUAL-06-07-2024 General Information Bid Invitation KHRC Office Remodel MCP Supplemental Conditions.2021 2021 Addenda None at this time.

article thumbnail

Wyndham Echo Round Rock, TX

The MCP Group

Bid Due Date | February 20, 2024 12:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)

article thumbnail

Echo Suites – Pasadena, TX

The MCP Group

Bid Due Date | August 31, 2023 2:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)