Remove Flooring Systems Remove Masonry Remove Steel Fabrication
article thumbnail

Offsite vs. Onsite Construction Part 2

Civil + Structural Engineer

The benefits of offsite construction, which comprises the manufacturing, planning, design, fabrication, and assembly of building elements offsite are expansive. The panel of experts below, representing the construction, engineering, and building systems industries, explore and explain the many benefits of this alternative construction method.

article thumbnail

From mass masonry to veneer: The evolution of cavity wall design

Construction Specifier

During the transition from mass masonry walls to the “four barrier” (i.e. These assemblies lack many necessary components that comprise an effective building enclosure system. Transition from mass to today’s veneer Mass masonry construction was commonly used in the U.S. prior to 1890.

Masonry 64
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Woven in stone: The role of CMUs in architectural design

Construction Specifier

By using concrete masonry units (CMUs) as the dominant exterior building material, the design was able to incorporate the company’s heritage into the exterior appearance, creating a woven pattern. We were able to angle the masonry to deflect the sun on five- and 10-degree angles.

article thumbnail

Lee Lofts Phase 2 – Salina, KS

The MCP Group

Bid Due Date | March 9, 2023 2:00 PM Project Description Existing 5-story heavy timber frame and masonry building. Will be restored into a 50-unit apartment building.

article thumbnail

Wyndham Echo Round Rock, TX

The MCP Group

Bid Due Date | February 20, 2024 12:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)

article thumbnail

Echo Suites – Pasadena, TX

The MCP Group

Bid Due Date | August 31, 2023 2:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)

article thumbnail

Echo Suites – Fort Worth, TX

The MCP Group

Bid Due Date | July 19, 2023 2:00 PM Project Description New Construction of a 4 story wood framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)