A System that Takes Developers and Builders from Design to Completion

The Pro Builder

A System that Takes Developers and Builders from Design to Completion qpurcell Fri, 03/08/2024 - 11:41 When the team behind the design-build company Shibusa Systems researched the causes of the U.S. Reynolds, cofounder, president, and CEO, Shibusa Systems. The upshot? Fewer people can build many more homes per year.”

article thumbnail

Robust Facilities Sustainment Solution

Job Order Contracting

to name a few. #2. to name a few. #2. to name a few. #2. Implement a robust physical asset facilities maintenance process integrating scheduled, unscheduled repairs, and preventive maintenance tasks. #3.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

The Critical Role of Plumbing in New Construction Projects

CCR Magazine

When considering new construction projects, plumbing might not be the initial aspect that comes to mind. Most people imagine the foundation being poured, walls going up, or roofing installed. But without a well-thought-out plumbing system, all those flashy construction parts wouldn’t be functional!

article thumbnail

Adair County Awarded Preserve Missouri 2024 Project of the Year Project with Veregy

Civil + Structural Engineer

renovation project integrated energy-efficient systems into the 126-year-old courthouse structure, reducing energy consumption while maintaining the building’s historical integrity. Innovative Solutions Driving Sustainable Success The $8.1M

article thumbnail

HGA Completes the Pennsylvania State Archives in Harrisburg, Pennsylvania

Civil + Structural Engineer

Leading schematic design and design development, HGA also served as the engineers-of-record from beginning to end, providing structural, mechanical, electrical, and plumbing (MEP), including lighting design, audio/visual, and telecom/security. Rain landing on the low slope roof runs down to roof drains over the mechanical rooms.

article thumbnail

A Case (Study) for Off-Site Construction in Home Building

The Pro Builder

Rather, it employed an off-site construction method that built all of the wall panels, floor panels, and roof trusses in a nearby factory and assembled them on site in fewer than three days. Agorus' framing package for Daybreak included premade floor systems, each panel specifically engineered for its application in the system.

article thumbnail

Adventures in Renovation: The Historic Courthouse and the Stair and Elevator Tower Conundrum

Civil + Structural Engineer

In the case of the Theodore Levin US Courthouse, however, the existing building occupies an entire city block and the upper floors are arranged in a “donut” shape with offices and courtrooms surrounding an interior light court. What worked well for the upper floors to minimize disruption became challenging on the interior of the building.