Remove Flooring Systems Remove Plumbing Systems Remove Steel Fabrication Remove Structural Systems
article thumbnail

Adventures in Renovation: The Historic Courthouse and the Stair and Elevator Tower Conundrum

Civil + Structural Engineer

Additions are commonly made to the side of a building, which simplifies the structure and creates one plane where the new interfaces with the existing. What worked well for the upper floors to minimize disruption became challenging on the interior of the building.

article thumbnail

Oregon architect’s HQ: Northwest’s first ‘all-wood’ mass timber project

Construction Specifier

The building represents a structure made almost entirely of wood with all-electric, refrigerant-free, hydronic heating, and cooling systems. The Mississippi building, serving as Waechter Architecture’s headquarters in Portland, Oregon, features the use of mass timber in almost every aspect of the structure.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

FHSU Forsyth Library Renovation

The MCP Group

Location Hays, Kansas Plans FHSU Forsyth Library Renovation Combined Plans Specifications FHSU Forsyth Library Renovation Combined Specifications General Information Bid Invitation FHSU Forsyth Library Renovation MCP Supplemental Conditions.2021 2021 Addenda ADD 1 The post FHSU Forsyth Library Renovation appeared first on MCP GROUP.

article thumbnail

Reaching a new level of sophistication with panelized construction

Construction Specifier

Construction of wall, floor, and roof systems offsite has multiple advantages, including compressing the project schedules, reducing site labor and waste, improving consistency and quality control, and increasing safety for workers. However, all will have the structural skeleton of the frame. Photo courtesy American Panel Tec.

article thumbnail

Wyndham Echo Round Rock, TX

The MCP Group

Bid Due Date | February 20, 2024 12:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)

article thumbnail

Echo Suites – Pasadena, TX

The MCP Group

Bid Due Date | August 31, 2023 2:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)

article thumbnail

Echo Suites – Fort Worth, TX

The MCP Group

Bid Due Date | July 19, 2023 2:00 PM Project Description New Construction of a 4 story wood framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)