Remove Flooring Systems Remove Site Planning Remove Wall Systems
article thumbnail

Light at the End of the Tunnel

Civil + Structural Engineer

In fact, the storm drain system is about 100 years old. Minneapolis development combined with increased rainfall brings more water into the system, which heightens the pressure on the tunnel. Despite the recent growth, some of the citys underground infrastructure is not so new. Michael, Minnesota, won the bid for the job.

article thumbnail

Renovated historic site gets structural and mechanical overhaul

Construction Specifier

Renovation work included significant reinforcement of the original structure, restoration of historic interior trim, and upgrading modern mechanical and fire safety systems through original masonry walls. Many of the original doors have been restored and fixed in place on unit walls and throughout hallways.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Ways to Improve Home Building Productivity, Part 2: Automation

The Pro Builder

Ways to Improve Home Building Productivity, Part 2: Automation ibush Thu, 02/15/2024 - 15:31 Home builders can maximize efficiencies gained through simplification and standardization by automating both on-site and back-office operations Tony L. Consider the potential benefits of off-site construction to your current home building process.

article thumbnail

Offsite vs. Onsite Construction Part 2

Civil + Structural Engineer

The benefits of offsite construction, which comprises the manufacturing, planning, design, fabrication, and assembly of building elements offsite are expansive. Additionally, the environmental impact is lessened due to minimal shipping and packing materials delivered to the site and enhanced energy efficiency in the final construction.

article thumbnail

Prefab, Modular Homebuilder Touts Energy and Cost Benefits

The Pro Builder

A heating recovery system uses the exhausted air to pre-heat and pre-cool incoming air before it’s delivered to the home. The factory panelizes the ceilings, floors, and walls, then brings all the elements together to form the module. Next year, it plans to create about 240 modules. Factory modular homebuilding process.

article thumbnail

The Desert Comfort Idea Home: a True Desert Oasis

The Pro Builder

The home’s single-level floor plan maintains a relatively compact footprint to preserve and protect its natural surroundings. The living area of the home’s open floor plan is anchored by a 6-foot-long direct-vent gas fireplace that recirculates heat back into the room, as needed, to reduce energy loads.

article thumbnail

Top 10 Construction Defects: Prevent These Costly Building Mistakes

UK Construction Blog

The most dangerous defects include structural issues (foundation cracks, wall collapses), water infiltration, electrical/plumbing failures and HVAC system problems, which often remain hidden for years. Construction defects typically stem from poor workmanship, substandard materials, improper site preparation, or inadequate maintenance.