Remove Flooring Systems Remove Steel Fabrication Remove Structural Systems Remove Wall Systems
article thumbnail

Adventures in Renovation: The Historic Courthouse and the Stair and Elevator Tower Conundrum

Civil + Structural Engineer

Additions are commonly made to the side of a building, which simplifies the structure and creates one plane where the new interfaces with the existing. What worked well for the upper floors to minimize disruption became challenging on the interior of the building.

article thumbnail

Offsite vs. Onsite Construction Part 2

Civil + Structural Engineer

The benefits of offsite construction, which comprises the manufacturing, planning, design, fabrication, and assembly of building elements offsite are expansive. The panel of experts below, representing the construction, engineering, and building systems industries, explore and explain the many benefits of this alternative construction method.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Harvard University’s new building features hydroformed facade for energy efficiency

Construction Specifier

Harvard University Science and Engineering Complex (SEC) in Boston, Massachusetts, uses a specially designed hydroformed tensile facade system made of stainless steel to maximize energy efficiency and provide occupant comfort. The facade’s stainless-steel material is both delicate and lightweight, mimicking the qualities of fabric.

article thumbnail

From mass masonry to veneer: The evolution of cavity wall design

Construction Specifier

The design of contemporary cavity wall assemblies is the result of a century of trial and error. During the transition from mass masonry walls to the “four barrier” (i.e. water, air, vapor, and thermal barrier) assemblies of today’s construction, the “early veneer walls” constructed between the mid- to late-20 th century emerged.

Masonry 64
article thumbnail

CFS fabricator gets engineering award for complex Arizona project

Construction Specifier

The facade of Mayo West Tower in Phoenix, Arizona, for which the cold-formed steel (CFS) fabricator, Digital Building Components, has won an engineering honor. The structure of the building consists of concrete over metal deck with steel moment frames and prefinished exterior CFS non-load bearing wall panels.

article thumbnail

Reaching a new level of sophistication with panelized construction

Construction Specifier

Construction of wall, floor, and roof systems offsite has multiple advantages, including compressing the project schedules, reducing site labor and waste, improving consistency and quality control, and increasing safety for workers. However, all will have the structural skeleton of the frame.

article thumbnail

Oregon architect’s HQ: Northwest’s first ‘all-wood’ mass timber project

Construction Specifier

The building represents a structure made almost entirely of wood with all-electric, refrigerant-free, hydronic heating, and cooling systems. The Mississippi building, serving as Waechter Architecture’s headquarters in Portland, Oregon, features the use of mass timber in almost every aspect of the structure.