article thumbnail

Light at the End of the Tunnel

Civil + Structural Engineer

In fact, the storm drain system is about 100 years old. Minneapolis development combined with increased rainfall brings more water into the system, which heightens the pressure on the tunnel. Despite the recent growth, some of the citys underground infrastructure is not so new. Michael, Minnesota, won the bid for the job.

article thumbnail

Renovated historic site gets structural and mechanical overhaul

Construction Specifier

Renovation work included significant reinforcement of the original structure, restoration of historic interior trim, and upgrading modern mechanical and fire safety systems through original masonry walls. Many of the original doors have been restored and fixed in place on unit walls and throughout hallways.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

MBCEA Announces 2024 Building of the Year Winners

Civil + Structural Engineer

It includes a total of seven buildings erected together to create an all-in-one complex with a standing seam metal roof and insulated metal wall panels. was the metal building systems provider. was the metal building systems provider. Commercial – Award of Merit : Floors & Doors 2.0 Garanco, Inc.

article thumbnail

Maine GC spotlights new prefab facility

Construction Dive

Wright-Ryan’s Portland factory provides a controlled environment for millwork, wall and floor systems and employee training.

Millwork 188
article thumbnail

PERI Delivers Formwork & Scaffolding Solutions for Boston’s Seaport Square

Civil + Structural Engineer

The 525,000-square foot, 17-story building features two floors of restaurant and retail space and 15 stories of office space, occupied by Amazon’s Boston Tech Hub. PERI USA was selected to be the singular supplier for formwork solutions, delivering large quantities of formwork, scaffolding, and climbing systems.

article thumbnail

BILCO Unveils New Flood-Tight Access Door to Withstand 30-foot Head of Water

Civil + Structural Engineer

NEW HAVEN, CT – The BILCO Company has introduced a new flood-tight floor access door that can withstand a 30-foot head of water from the topside, adding another component to its line of specialty access products for commercial applications. billion in damages related to Superstorm Sandy.

article thumbnail

Efficient Heating & Cooling for Your Business with Mini Splits

Wolgast Corporation

When it comes to heating and cooling in small commercial building additions, remodels, or IT/server rooms, traditional central HVAC systems often fall short. Thats where mini split heating and cooling systems offer a smart, flexible solution. Units can be mounted to a wall, sat on the floor like a radiator, or recessed in the ceiling.