article thumbnail

Adventures in Renovation: The Historic Courthouse and the Stair and Elevator Tower Conundrum

Civil + Structural Engineer

A significant number of MEP systems, some active and some abandoned, needed to be demolished and moved out of the footprint of the tower just under the second floor roof. New micropiles were drilled to support the tower foundations and massive structural steel columns were set in place to support the tall tower.

article thumbnail

Water Leakage from Ceiling | water leakage from ceiling | How to Stop Water Leakage from Ceiling

CivilJungle

The water leakage problems are due to various issues such as defective plumbing systems. If the faces of the walls are exposed to the rain and it is not properly protected and waterproofing is done. If the lack of drainage system provided due to which the water is getting accumulated and causes the problems of leakages.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

16 Types of Building Components | How a Building Is Constructed | 19 Different Types of Building Construction Phases

CivilJungle

Under every house is a foundation , and under most footing is Bedding for Footing. Also, Read: Difference Between Footing and Foundation | What is Footing and Foundation. #2. Generally, the plinth is built slightly well above the ground floor sometime after the foundation. Next the foundation goes in.

article thumbnail

Polysulfide Sealant Vs Polyurethane Sealant | Functions of Sealants | What Is Polysulphide Sealant | What Is Polyurethane Sealant

CivilJungle

In building construction, the first stage is earth excavation , which is then followed by dewatering the trenches, laying of brick flat sloping and PCC layer, placing of reinforcement caging for the construction of footings, and finally the Concreting of foundations. Adhesive resins such as bitumen, tar, natural gum, wax etc.

article thumbnail

19 Different Types of Slabs in Construction | What Is a Slab

CivilJungle

Utilized during a flat plate system, it’s impossible to possess a sizeable span. They require a specific level of thickness to maintain their strength – usually at least 4 inches for a slab -on-grade foundation. It eliminates the need to drill in slabs for an electrical and plumbing unit. Higher slab bulkiness.

article thumbnail

What Is Drywall | Drywall Water Damage | Drywall Water Damage Repair | Cost to Repair Drywall Ceiling Water Damage

CivilJungle

Drywall is basically a gypsum board which is installed on the interior wall of the house. The installation process of drywall is almost the same as other interior objects. It is a green coloured board with a wax finish over it for waterproofing. Here, cement is used for waterproofing. Drywall Installation.

article thumbnail

How to Building Construction Process Step by Step

CivilJungle

Then after architect consult with a structural engineer and MEP engineer for details of the reinforcements and other detail for use, how deep your foundation will be, the size of gravel to be used, column width, electrical, plumbing, etc. Foundation. Foundation work is done based on drawings provided by the architect.