A Case (Study) for Off-Site Construction in Home Building
The Pro Builder
APRIL 22, 2023
The digital twin produced hyper-accurate renderings that reflected data gleaned from a laser scan of the site after the foundation slabs were poured. The design process also included pre-coordination with the mechanical, electrical, and plumbing (MEP) teams to mitigate any clashes of the utility infrastructure.
Let's personalize your content