article thumbnail

A New Era of Bridge Construction Technology Lands in the U.S.

Civil + Structural Engineer

by constructing a modular bridge system, that is pre-engineered, with an internal self-supporting superstructure that includes the reinforcing steel and formwork. Since the prefabricated abutments are delivered complete with formwork and reinforcing steel, they were installed on the foundation and ready to be filled with concrete on day one.

article thumbnail

A Case (Study) for Off-Site Construction in Home Building

The Pro Builder

The digital twin produced hyper-accurate renderings that reflected data gleaned from a laser scan of the site after the foundation slabs were poured. Agorus' framing package for Daybreak included premade floor systems, each panel specifically engineered for its application in the system. What About Design?

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Ralph Wilson Park Bridge Successfully Installed in City of Buffalo Over I-190,  

Civil + Structural Engineer

Foundation added a major infrastructure project to the original scope of the park design: the pedestrian bridge and the redesign of the 4th Street side of the park. Foundation said, “It took collaboration at all levels to deliver on this new iconic piece of infrastructure to make this waterfront park more accessible for the Buffalo community.

article thumbnail

Offsite vs. Onsite Construction Part 2

Civil + Structural Engineer

The panel of experts below, representing the construction, engineering, and building systems industries, explore and explain the many benefits of this alternative construction method. NAHB (National Association of Home Builders) analysis shows it typically takes two days to set a modular home on its permanent foundation.

article thumbnail

Trial to trend: the growth of prefabricated exterior walls

Construction Specifier

Photos courtesy StoPanel Affiliate Southern Wall Systems. A global pandemic rocking the foundation of a world economy. When prefabrication enters the construction equation, the variables change dramatically. The evolution of prefabrication stretches back more than 40 years. By Tim Salerno.

article thumbnail

raSmith Cold-Formed Steel Structural Engineering Projects Earn Design Excellence Awards; raSmith’s Pat Ford Receives John P. Matsen Distinguished Service Award

Civil + Structural Engineer

Starbucks (Staten Island, NY): The Richmond Road Starbucks is a single-story, 1,875-square-foot, load-bearing cold-formed steel structure on a cast-in-place concrete foundation. The Rosie (Chicago, IL): This seven-story apartment building offers luxury residential units, two high- profile retail spaces, and parking in an amenity-packed site.

article thumbnail

How Industrialized Construction Is Changing the Way We Build   

Autodesk Construction Cloud

One way to dramatically improve productivity for construction and improve sustainability is to “productize” building systems and common building elements to enable the use of manufacturing methods, enable scale, and increase sustainability – these concepts are the core of Industrialized Construction (IC). . Taking it to the Experts .