Remove Health Regulations Remove Heavy Lifting Transportation Remove Insurance Management
article thumbnail

Learn About the Latest News About the Future of Construction, UK Construction Sector Grows Fastest in 2 Years, on AI Utilisation, and Drones in Revolutionising Building to Boost UK Housing

UK Construction Blog

The guarantees made by Labour are providing the construction industry with a much-needed lift. The headline S&P Global Construction Purchasing Managers’ Index unexpectedly climbed to 55.3 Their 3D Generative-AI Tool will increase sustainability in commercial transportation, flying, and power generation.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Preventative maintenance is critical to facilities occupant health and safety, as well as meeting an organization’s fiduciary responsibilities. This section does not address powered man-lifts, harnesses, self retracting fall limiters, shock absorbers, and other related fall protection equipment that falls into the above requirements.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 41 23 Bid Form – Construction Management (Single-Prime Contract). 00 41 26 Bid Form – Construction Management (Multiple-Prime Contract). 00 42 23 Proposal Form – Construction Management (Single-Prime Contract). 00 42 26 Proposal Form – Construction Management (Multiple-Prime Contract).

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 41 23 Bid Form – Construction Management (Single-Prime Contract). 00 41 26 Bid Form – Construction Management (Multiple-Prime Contract). 00 42 23 Proposal Form – Construction Management (Single-Prime Contract). 00 42 26 Proposal Form – Construction Management (Multiple-Prime Contract).