Remove Heavy Equipment Manufacturing Remove HVAC System Installation Remove Piping Installation
article thumbnail

Complete Construction Terminology Cheat Sheet: US and AU Specific

Buildern

These guidelines cover everything from how structures are designed to the electrical systems, plumbing, fire safety measures, and even accessibility. Have everything under control with a flexible hierarchical folder system that can be accessed from any device. Well, it sets the stage for success.

article thumbnail

Roof Storm Damage Checklist | What to Do After a Storm on Roof | Types of Roof Storm Damage | Roof Storm Damage Checklist

CivilJungle

Also Read: Types of Roof Tiles | Tile Roof Replacement | Tile Installation Cost | Roofing Tile Price | Ceramic Tile Price Per Square Foot | Tile Installation Factors. If your roof has not had a proper drainage system, then you must face the issue of standing water problem. New Shingle Installation. Lead Pipe Jacks.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Check hydraulic unit fluid level and pressures/ change fluid per manufactures recommendations. Check hydraulic unit fluid connections, pump, piping and hoses for damage and leaks. Recommended Tools, Materials, and Equipment: 1. This standard is not intended to address all fall protection related equipment. Tool Group A.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Process Equipment Subgroup: Divisions 40 – 49. Divisions are the top Level (Level 1) in the hierarchy of the classification system. 00 62 89 Construction Equipment Form.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Process Equipment Subgroup: Divisions 40 – 49. Divisions are the top Level (Level 1) in the hierarchy of the classification system. 00 62 89 Construction Equipment Form.

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

BD: Board, Blow Down (pipe). CIP: Cast Iron Pipe, Cast-in-Place. CISP: Cast Iron Soil/sewer Pipe. CMP: Corrugated Metal Pipe. CTSC: Communications Systems Terminal Cabinet. EIFS: Exterior Insulation and Finish System. EQP: Equipment. EQPT: Equipment. EQUIP: Equipment. BEL: Below.

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

BD: Board, Blow Down (pipe). CIP: Cast Iron Pipe, Cast-in-Place. CISP: Cast Iron Soil/sewer Pipe. CMP: Corrugated Metal Pipe. CTSC: Communications Systems Terminal Cabinet. EIFS: Exterior Insulation and Finish System. EQP: Equipment. EQPT: Equipment. EQUIP: Equipment. BEL: Below.