Remove Heavy Lifting Transportation Remove Mapping Remove Zoning
article thumbnail

Complete Construction Terminology Cheat Sheet: US and AU Specific

Buildern

Picture it like a super-detailed treasure map that shows every nook and cranny of a building before it’s even built. There are zoning regulations, building codes, and environmental requirements that need to be followed to create a safe and harmonious environment. Permits ensure that your project plays by the rules.

article thumbnail

Cover Story: 2014 Business Facilities – Metro And Global Rankings

Business Facilities

Some heavy business hitters also are placing huge wagers on Detroit’s recovery, most prominently Quicken Loans founder Dan Gilbert, a native son of Michigan, has spent more than $1 billion to acquire 3 million square feet of real estate in the heart of downtown Detroit. Other allocations include $12.5 million-square-foot plant.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

This section does not address powered man-lifts, harnesses, self retracting fall limiters, shock absorbers, and other related fall protection equipment that falls into the above requirements. Sliding Doors a) Center door within track and remove, start by lifting up to remove from bottom track first. Adjust and service as needed.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

02 81 00 Transportation and Disposal of Hazardous Materials. 03 35 16 Heavy-Duty Concrete Floor Finishing. 03 47 16 Lift-Slab Concrete. Conservation Treatment for Period Heavy Timber. 02 81 00 Transportation and Disposal of Hazardous Materials. 03 35 16 Heavy-Duty Concrete Floor Finishing. Conditions.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

02 81 00 Transportation and Disposal of Hazardous Materials. 03 35 16 Heavy-Duty Concrete Floor Finishing. 03 47 16 Lift-Slab Concrete. Conservation Treatment for Period Heavy Timber. 02 81 00 Transportation and Disposal of Hazardous Materials. 03 35 16 Heavy-Duty Concrete Floor Finishing. Conditions.