Remove Heavy Lifting Transportation Remove Permits Remove Ramps
article thumbnail

Top Tips for Moving Heavy Construction Equipment Safely

PN - Project Management

Whether you're relocating equipment within a construction site or transporting it to a new location, proper procedures are essential to prevent accidents and damage. Follow some top tips for moving heavy construction equipment safely. ​ Cranes, lifting equipment and slings "Accidents can cause injury and damage equipment."

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

This section does not address powered man-lifts, harnesses, self retracting fall limiters, shock absorbers, and other related fall protection equipment that falls into the above requirements. Sliding Doors a) Center door within track and remove, start by lifting up to remove from bottom track first. Adjust and service as needed.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 31 43 Permit Application. 00 31 46 Permits. 01 41 26 Permit Requirements. 01 53 23 Temporary Ramps. 01 41 26 Permit Requirements. 01 53 23 Temporary Ramps. 02 81 00 Transportation and Disposal of Hazardous Materials. 03 35 16 Heavy-Duty Concrete Floor Finishing. 03 47 16 Lift-Slab Concrete.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 31 43 Permit Application. 00 31 46 Permits. 01 41 26 Permit Requirements. 01 53 23 Temporary Ramps. 01 41 26 Permit Requirements. 01 53 23 Temporary Ramps. 02 81 00 Transportation and Disposal of Hazardous Materials. 03 35 16 Heavy-Duty Concrete Floor Finishing. 03 47 16 Lift-Slab Concrete.