Remove Historic Preservation Remove Roofing Systems Remove Stonework
article thumbnail

Protecting lives and our most important heritage

Specification Product Update

As part of the project to preserve this Grade One listed building for future generations, a fire resistant solution was required for an ornate window in the newly created Bright Hall, a new community space. The SYSTEMGLAS Ligna timber-framed fire resistant glazing system provided the ideal solution.

article thumbnail

Innovations in Scottish Residential Architecture: Blending Tradition with Modernity

UK Construction Blog

Historical constructions, with their robust stonework and intricate designs, provide a foundation for modern architects to build upon. Modern Infusion by Award Winning Scottish Architects Esteemed Scottish designers have mastered the art of preserving historical essence while infusing contemporary aesthetics.

article thumbnail

Find About the Latest News on Steel Used to Build the UK Wedgetail Facility, the Dispute Over UK Parliament’s £22bn Renovations, Innocrete3d Launches UK 3dcp, and a Timber in Construction Roadmap Should Start With Education

UK Construction Blog

Along with steel, the British government obtained 7,000-square-metre (75,000-square-foot) cladding for the E-7 maintenance and mission systems training buildings. McLaughlin & Harvey reported that the 100-million-pound ($124 million) mission systems training facility is being built next to Lossiemouth’s P-8A Poseidon hangar.