Remove HVAC System Installation Remove Plumbing Systems Remove Waterproofing Systems
article thumbnail

How to Building Construction Process Step by Step

CivilJungle

Then after architect consult with a structural engineer and MEP engineer for details of the reinforcements and other detail for use, how deep your foundation will be, the size of gravel to be used, column width, electrical, plumbing, etc. Plastering work can commence after the initial lighting and electrical plumbing work was completed.

article thumbnail

Transforming Your Basement Bathroom

CCR Magazine

Initially, homeowners must assess the feasibility of the project, focusing on the existing layout, plumbing, and structural requirements. Key considerations such as waterproofing and moisture control are critical due to Ottawa’s climate. Use waterproof materials such as vinyl or ceramic tile for flooring and walls.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Materials to Deter Cockroaches: Guide to Pest-Resistant Builds

CCR Magazine

A baby cockroach likes to establish themselves in wall voids, beneath flooring, and around plumbing fixtures areas where traditional pest control methods struggle to reach. Materials with excellent waterproofing properties and vapor barriers not only protect the building structure but also create inhospitable conditions for nymphs.

article thumbnail

Polysulfide Sealant Vs Polyurethane Sealant | Functions of Sealants | What Is Polysulphide Sealant | What Is Polyurethane Sealant

CivilJungle

After the Concreting work is almost finished, the brick walls (in a framed structure, they are used as partition walls) are constructed, which is then followed by building finishes and additional works, such as plumbing, electrification etc. Due to many reasons, in inadequate dewatering, faults in plumbing system etc.,

article thumbnail

16 Types of Building Components | How a Building Is Constructed | 19 Different Types of Building Construction Phases

CivilJungle

The damp proof course is often a coating of waterproofing substance including such asphalt and waterproof cement. This system uses a continuous cleat for high wind uplift resistance. Also, Read: What Is a Brick Bat Coba | Procedure of Brick Bat Coba Waterproofing | Advantages & Disadvantage of Brick Bat Coba Waterproofing.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Clean scale from head(s) after removing and install cover plate. Remove fill tube cap, install spacer pipe and install fill tube. Remove fountain head cover(s) (if applicable) and install fountain head. Application: This standard applies to all installed sprinkler systems with nozzles. Check Points: Fall 1.

article thumbnail

Reopening The Glass House with National Historic Trust

CCR Magazine

The interior had experienced deterioration of plaster, mold growth, and rusting mechanical systems. In the 10-foot, 8-inch tall, white corridor connecting the bedroom to the reading room and bathroom, a collection of etchings by Brice Marden, collected by Johnson and Whitney, are now re-installed after being in storage since 2009.