This site uses cookies to improve your experience. To help us insure we adhere to various privacy regulations, please select your country/region of residence. If you do not select a country, we will assume you are from the United States. Select your Cookie Settings or view our Privacy Policy and Terms of Use.
Cookie Settings
Cookies and similar technologies are used on this website for proper function of the website, for tracking performance analytics and for marketing purposes. We and some of our third-party providers may use cookie data for various purposes. Please review the cookie settings below and choose your preference.
Used for the proper function of the website
Used for monitoring website traffic and interactions
Cookie Settings
Cookies and similar technologies are used on this website for proper function of the website, for tracking performance analytics and for marketing purposes. We and some of our third-party providers may use cookie data for various purposes. Please review the cookie settings below and choose your preference.
Strictly Necessary: Used for the proper function of the website
Performance/Analytics: Used for monitoring website traffic and interactions
Underground utility tunnels play a vital role in the continuous functioning of utility services on campus such as steam, chilled water, electricity, domestic water, and telecom systems, housing and protecting the piping and cables necessary to each. In other instances, remediation isn’t as straightforward.
The most dangerous defects include structural issues (foundation cracks, wall collapses), water infiltration, electrical/plumbing failures and HVAC system problems, which often remain hidden for years. Examples include improperly installed plumbing, electrical wiring errors, and poor finishes.
Maintaining the sewer pipes in your commercial property might not be the first thing on your mind, but it’s crucial for protecting your investment. Whether you own office buildings, retail spaces, or industrial properties, ensuring the health of your sewer system can save you from costly repairs down the line.
When designed and installed correctly, air barriers contribute to the long-term durability of a building. Improving building enclosure performance While energy efficiency might initially suggest well-insulated walls and efficient HVAC systems, controlling air leakage can be just as critical.
Key Takeaways Damp and rot prevention requires a multi-layered approach, incorporating proper drainage, ventilation systems, and moisture barriers during construction phases. Regular maintenance, including six-monthly external inspections and quarterly internal checks, is crucial for identifying early warning signs of damp and rot issues.
Introduction of Soil Vent Pipe. The plumbing system and the Drainage of the important aspect of the building because it helps to drain off the wastewater from the building. The wastewater in the building should be properly removed through the pipes to the septic tanks and sanitary sewer. What Is Soil Vent Pipe?
Pipes are connected with the help of joints. A variety of joints are used in an assembly of pipes. Connecting two or more pipes together is called a fitting. Various types of joints could be used in a pipe as per the requirement. Generally, the pipe joint fitted can easily sustain the pressure created in the pipe.
Hire a qualified inspector to evaluate existing moisture conditions, identify potential water entry points, and recommend appropriate waterproofing solutions. Structural Inspection: Verify that your foundation is sound and capable of supporting additional fixtures and finishes.
Pipes are connected with the help of joints. A variety of joints are used in an assembly of pipes. Connecting two or more pipes together is called a fitting. Various types of joints could be used in a pipe as per the requirement. Generally, the pipe joint fitted can easily sustain the pressure created in the pipe.
Drop manhole is a type of manhole where the vertical pipe is permitted to flow between the main sewer and branch sewer. This type of manhole is used in steep areas or where the elevation of the inlet pipe is more than the elevation of the outlet pipe. These outside drops are for routine checking, inspection and cleaning purpose.
They’re installed in the walls and slabs such that they are concealed and not visible after the finishing work is done. The pipe and point end left out this later. Waterproofing can also be done to prevent rising dampness from the wall. Install Insulation. Installing the Roof. Installing Fixtures.
Regular Roof Inspections and Maintenance One of the most crucial elements of weather-proofing your building is maintaining the roof. A solid roofing system that’s regularly inspected and maintained can significantly reduce the chances of weather-related issues.
Leaky roofs, poor drainage systems, and hidden plumbing issues can all lead to long-term damage. Proper ventilation, waterproofing, and regular inspections can go a long way in preventing hidden water damage before it spreads. These issues may not be obvious during a quick inspection, but they eventually lead to costly repairs.
Their job involves inspecting constructions during various stages of the project, reviewing plans and specifications, issuing permits and approvals, and reporting any violations or issues. They cut and bolded the framing and performed electrical checks to ensure the system was functioning properly.
The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. 01 21 19 Testing and Inspecting Allowances. 01 21 23 Installation Allowances.
The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. 01 21 19 Testing and Inspecting Allowances. 01 21 23 Installation Allowances.
Inspect electrical power panel. Inspect control panel for loose connections. Check hydraulic unit fluid connections, pump, piping and hoses for damage and leaks. Inspect Bollard/Barricade coatings, decals and paint. Visually inspect for corrosion. Inspect gear box, change or add oil as required.
Drywall is basically a gypsum board which is installed on the interior wall of the house. The installation process of drywall is almost the same as other interior objects. It is a green coloured board with a wax finish over it for waterproofing. Here, cement is used for waterproofing. Drywall Installation.
The lateral and gravity load resistance system in this system consists of reinforced concrete walls and slabs of reinforced concrete. There are no joints in the concrete, and as long as the support and anchor bolts are properly installed, you have a sturdy foundation that can handle a lot of weight. #3. Poor Maintenance.
Utilized during a flat plate system, it’s impossible to possess a sizeable span. These systems are light in weight & therefore considerable saving is ensured within the framework because a light framework is required. More expensive to install and maintain. It has flexibility due to the cable system.
In order to ensure the consistency of the resultant paving mixture and the pavement surface, regular inspections are carried out at the site. Bituminous materials were used for the construction of roads , preserving timber, and for waterproofing stone walls. Quality control of bituminous concrete construction. Grading Aggregate.
We organize all of the trending information in your field so you don't have to. Join 79,000+ users and stay up to date on the latest articles your peers are reading.
You know about us, now we want to get to know you!
Let's personalize your content
Let's get even more personalized
We recognize your account from another site in our network, please click 'Send Email' below to continue with verifying your account and setting a password.
Let's personalize your content