Integrated Project Delivery – IPD, Job Order Contracting – JOC, BIM, and Efficient Project Delivery

Building Information Management

Project delivery methods set the tone and largely dictate the relative success of any facility construction, renovation, repair, or sustainability project. Project delivery methods must therefore be a component of BIM, a fact many/most 3D visualization software vendors appear to have ignored. So what is IPD?

article thumbnail

The Role Owner’s Play in Building Construction, Repair, Renovation …

Building Information Management

They also select the construction delivery method. It is the owner and the associated construction delivery method that set the tone, outline roles and responsibilities, establish timelines and deliverables, contractually determine the level of collaboration, and ultimately determine the success of failure of a project.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Lean construction techniques

Job Order Contracting

Owner must provide value by sharing knowledge and collaborating in a timely manner with all service providers from concept through close-out, and not engage in excessive management and control. Owner and service provider(s) share risk and reward based upon aligned interests. LEAN CONSTRUCTION DELIVERY METHODS. White Papers.

article thumbnail

LEAN Job Order Contracting Intro 4

Job Order Contracting

Alignment of risk and reward with a party’s ability to control risk. Integrating operating, design and construction knowledge through broad based team meetings. ASSET LIFE-CYCLE MODEL – Total Cost of Ownership Management – A framework for facilities life-cycle management. Creating an open information environment.

article thumbnail

Unlock Public Sector Construction Productivity – A White Paper

Job Order Contracting

Unlock Public Sector Construction Productivity[1] with Proven Strategies: A White Paper. The risk of change is high, however, not pursuing fundamental change is potentially catastrophic. Two of these solutions are Integrated Project Delivery (IPD) and Job Order Contracting (JOC). Fully Compliant.

article thumbnail

Job Order Contracting – Lean Construction History

Job Order Contracting

The LEAN Integrated Construction Project Delivery Method. . Traditional design-bid-build (DBB) construction delivery was too inefficient for the large numbers of renovation, repair, and sustainment/maintenance projects. Have a Clear Chain of Command, however LEAD without Excessive Management and Control.

article thumbnail

LEANconstruction

Job Order Contracting

The application of LEANconstruction is a focus upon best value for all project participants. Shared risk/reward. Owners must lead the LEAN construction process and do so without excessive management and control. Facilities Management Considerations. Review construction delivery methods. Collaboration.