Remove Land Use Regulations Remove Schedule Management Remove Specialty Contracting
article thumbnail

Complete Construction Terminology Cheat Sheet: US and AU Specific

Buildern

In this article, we’re serving up a construction terminology cheat sheet to demystify the jargon used in the United States (US) and Australia (AU). By using the right words, we can minimize misunderstandings and keep errors at bay. This, however, doesn’t hinder the innovative spirit of US construction professionals.

article thumbnail

The Definitive Guide To General Contractor Licensing In Every State

Contractors Liability Blog

To make sure you have everything to comply with your States General Contracting licensing requirements we have prepared this handy guide. If there is a contract with a properly licensed contractor, then that is a subcontractor. No trade exam is required for the C-61 Limited Specialty license.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

This work should be scheduled at non-peak hours. Application: This standard applies to davits, structures typically used to lower things over an edge. All fall protection equipment is required by OSHA to be checked prior to each use. Schedule maintenance on these doors so that it does not interfere with loading dock operations.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Masterformat is a multiple level data structure consisting of numbers and titles/descriptions used to organize information by “work results” or construction practices. Procurement and Contracting Requirements Group (Division 00): Introductory Information: Indexing and general information documents. 00 00 00 Procurement and Contracting.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Masterformat is a multiple level data structure consisting of numbers and titles/descriptions used to organize information by “work results” or construction practices. Procurement and Contracting Requirements Group (Division 00): Introductory Information: Indexing and general information documents. 00 00 00 Procurement and Contracting.

article thumbnail

Centers of Technology: The Future Is Now

Business Facilities

The center’s specialty labs include a 3D-printing lab, electronics lab, metal fabrication lab and more, and boasts more than $3 million of prototyping and manufacturing equipment. King, Managing Director of the Quonset Development Corporation. In addition, mHUB has a microfactory for onsite low-volume production runs. Amazon’s new 2.4