article thumbnail

Complete Construction Terminology Cheat Sheet: US and AU Specific

Buildern

In this article, we’re serving up a construction terminology cheat sheet to demystify the jargon used in the United States (US) and Australia (AU). By using the right words, we can minimize misunderstandings and keep errors at bay. This, however, doesn’t hinder the innovative spirit of US construction professionals.

article thumbnail

The Definitive Guide To General Contractor Licensing In Every State

Contractors Liability Blog

To make sure you have everything to comply with your States General Contracting licensing requirements we have prepared this handy guide. If there is a contract with a properly licensed contractor, then that is a subcontractor. No trade exam is required for the C-61 Limited Specialty license. The application can be found HERE.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Locations For The Food Processing Industry: The Food Puzzle

Business Facilities

Across Ohio, there are more than 13 million acres of farmland and over 10 million acres used to grow principle crops of corn, soybeans, wheat and hay. Utt said the equipment and facilities used to produce melons has changed dramatically over the past several decades. To cover their building investment, Hirzel used a VP SSR roof system.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Application: This standard applies to davits, structures typically used to lower things over an edge. All fall protection equipment is required by OSHA to be checked prior to each use. Do not use defective ladders. This function should be performed once a month, during the time of year that the fireplace is in use.

article thumbnail

Centers of Technology: The Future Is Now

Business Facilities

The center’s specialty labs include a 3D-printing lab, electronics lab, metal fabrication lab and more, and boasts more than $3 million of prototyping and manufacturing equipment. Reaction Systems was awarded a $750,000 two-year SBIR contract based on prototypes and data ADAPT developed with them in less than two months time.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Masterformat is a multiple level data structure consisting of numbers and titles/descriptions used to organize information by “work results” or construction practices. Procurement and Contracting Requirements Group (Division 00): Introductory Information: Indexing and general information documents. 00 00 00 Procurement and Contracting.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Masterformat is a multiple level data structure consisting of numbers and titles/descriptions used to organize information by “work results” or construction practices. Procurement and Contracting Requirements Group (Division 00): Introductory Information: Indexing and general information documents. 00 00 00 Procurement and Contracting.