Remove Landscaping Remove Ramps Remove Site Planning
article thumbnail

Hundreds of projects to reconnect communities separated by roadways will launch in 2025

Civil + Structural Engineer

It will also include remediating a large, previously unusable brownfield site so that it can be used for greenspace. Plans call for adding a 10-foot multi-use path and buffered bicycle lanes on the north and south sides of the road, plus a sidewalk on the south side. Other project components, however, are still being designed.

article thumbnail

Works begin on Ballarat Station accessibility upgrade

Roads Online

Plans to improve accessibility at Ballarat Station include installing a pedestrian overpass with a passenger lift and stairs to both platforms, a new ramp and stairs to the northern station entrance, lighting and tactile upgrades, and landscaping.

Lifts 105
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Bowman Announces Major Infrastructure Openings for theContinuing Build Out of SDSU Mission Valley

Civil + Structural Engineer

These project components will provide the community with three improved ways of entry into SDSU Mission Valley and Snapdragon Stadium and are critical to the next phase of site development. It’s gratifying to be part of the exciting future of Mission Valley.” The new $310 million stadium opened in September 2022.

article thumbnail

$230 million upgrade to Monaro Highway begins

Roads Online

The landscaping plans are being finalised and will focus on local and native species, prioritising tree planting, water sensitive urban design and biodiversity conservation. Early preparatory works, involving site clearing and earthworks, started last month with large machinery, including excavators and trucks.

article thumbnail

LEGO breaks ground on $1B carbon-neutral factory in Virginia

Construction Specifier

When completed in 2025, the LEGO factory aims to be carbon-neutral, meaning it can demonstrate net-zero emissions from electricity and fuel use (scope one and two), using on-site or off-site renewable energy. The children’s ideas will inspire the final landscaping design in 2025. Rendering showing the lobby of LEGO’s factory.

article thumbnail

2 Hudson Square: A New Landmark in New York City’s Architectural Landscape

Construction Daily News

The new zoning plan focused on increasing residential options and enhancing the neighborhood’s mixed-use character. 2 Hudson Square Development The 2 Hudson Square project features a significant collaboration between key developers, unique architectural design, and a noteworthy acquisition of the development site.

article thumbnail

Addition by subtraction: The value of open space on higher education campuses

BDC Network

Even the best planned campuses will experience building turnover caused by perhaps obsolescence, growth, evolving programs, insufficient maintenance, revisioning, or new leadership. The campus’ terrain features prominent grade changes and therefore many bridges, ramps, stairs, and exterior elevators to facilitate pedestrian movement.