Remove Masonry Remove Roofing Systems Remove Steel Fabrication
article thumbnail

Offsite vs. Onsite Construction Part 2

Civil + Structural Engineer

The benefits of offsite construction, which comprises the manufacturing, planning, design, fabrication, and assembly of building elements offsite are expansive. The panel of experts below, representing the construction, engineering, and building systems industries, explore and explain the many benefits of this alternative construction method.

article thumbnail

Playing with Fabric

Civil + Structural Engineer

By Shannon Humbert, Legacy Building Solutions Rigid-frame fabric buildings offer a permanent solution for athletic facilities. For many entities, both public and private, the need for an athletics and recreation facility comes down to two options: A permanent brick and mortar building, or a lower-cost fabric bubble.

article thumbnail

11 Advantages Of Fabric Buildings

Construction Marketing

Since fabric buildings are tensile structures, the membrane can be pulled into a three-dimensional surface for developing shading, a roof, or a decorative component. Simply put, they’re a building made of all-steel frames and tarp covers or fabric material. Read on to learn about the advantages of fabric buildings.

article thumbnail

CDGB Bookstore – Independence, KS

The MCP Group

Bid Packages are available for the following; Demolition with ACM abatement, Masonry Restoration, Carpentry with window replacement, EPDM roofing system with (flashings, insulation, parapet caps, gutters and downspouts), Concrete, and Steel fabrications with installation.

article thumbnail

Wyndham Echo Round Rock, TX

The MCP Group

Bid Due Date | February 20, 2024 12:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)

article thumbnail

Echo Suites – Pasadena, TX

The MCP Group

Bid Due Date | August 31, 2023 2:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)

article thumbnail

Lee Lofts Phase 2 – Salina, KS

The MCP Group

Bid Due Date | March 9, 2023 2:00 PM Project Description Existing 5-story heavy timber frame and masonry building. Will be restored into a 50-unit apartment building.