Remove Millwork Remove Prefabrication Remove Wall Systems
article thumbnail

Trending: The Rise of Prefab and Modular Commercial Construction Techniques

Commercial Construction Blog

Prefabricated elements such as pre-cast concrete walls, which Englewood installed for a Blain’s Farm & Fleet store in Romeoville, Ill., Not all that long ago, when I was still a young laborer in the field, many items such as millwork, ductwork and mechanical components were still frequently fabricated on the job site.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. 03 81 16 Track Mounted Concrete Wall Sawing. 03 81 19 Wire Concrete Wall Sawing.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. 03 81 16 Track Mounted Concrete Wall Sawing. 03 81 19 Wire Concrete Wall Sawing.

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

CTSC: Communications Systems Terminal Cabinet. EIFS: Exterior Insulation and Finish System. HW: Hot Water, Heavy Wall. HWC: Hot Water Circulating, Heavy Wall Conduit. MWK: Millwork. NFWH: Non-freeze Wall Hydrant. PREFAB: Prefabricated. SEC: Second, Section, Secondary, Security System.

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

CTSC: Communications Systems Terminal Cabinet. EIFS: Exterior Insulation and Finish System. HW: Hot Water, Heavy Wall. HWC: Hot Water Circulating, Heavy Wall Conduit. MWK: Millwork. NFWH: Non-freeze Wall Hydrant. PREFAB: Prefabricated. SEC: Second, Section, Secondary, Security System.

article thumbnail

List of Common Construction Abbreviations

Job Order Contracting

CTSC: Communications Systems Terminal Cabinet. EIFS: Exterior Insulation and Finish System. HW: Hot Water, Heavy Wall. HWC: Hot Water Circulating, Heavy Wall Conduit. MWK: Millwork. NFWH: Non-freeze Wall Hydrant. PREFAB: Prefabricated. SEC: Second, Section, Secondary, Security System.