Remove Plumbing Systems Remove Roofing Systems Remove Steel Fabrication
article thumbnail

Trimble Announces 2024 Tekla Global BIM Awards Winners

Civil + Structural Engineer

The project was characterized by the high level of detail of the model (LOD400) with highly-detailed steel structures and precast concrete elements. The Tekla software assisted in managing the complex presetting of the more than 2,500 meters of roof, ensuring the right camber after erection.

article thumbnail

Adventures in Renovation: The Historic Courthouse and the Stair and Elevator Tower Conundrum

Civil + Structural Engineer

A significant number of MEP systems, some active and some abandoned, needed to be demolished and moved out of the footprint of the tower just under the second floor roof. New micropiles were drilled to support the tower foundations and massive structural steel columns were set in place to support the tall tower.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Reaching a new level of sophistication with panelized construction

Construction Specifier

Construction of wall, floor, and roof systems offsite has multiple advantages, including compressing the project schedules, reducing site labor and waste, improving consistency and quality control, and increasing safety for workers. Photo courtesy American Panel Tec. Then they are shipped and erected.

article thumbnail

Wyndham Echo Round Rock, TX

The MCP Group

Bid Due Date | February 20, 2024 12:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)

article thumbnail

Echo Suites – Pasadena, TX

The MCP Group

Bid Due Date | August 31, 2023 2:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)

article thumbnail

Echo Suites – Fort Worth, TX

The MCP Group

Bid Due Date | July 19, 2023 2:00 PM Project Description New Construction of a 4 story wood framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)

article thumbnail

Echo Suites – Fort Worth, TX

The MCP Group

Bid Due Date | July 19, 2023 2:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)