article thumbnail

Adventures in Renovation: The Historic Courthouse and the Stair and Elevator Tower Conundrum

Civil + Structural Engineer

A significant number of MEP systems, some active and some abandoned, needed to be demolished and moved out of the footprint of the tower just under the second floor roof. New micropiles were drilled to support the tower foundations and massive structural steel columns were set in place to support the tall tower.

article thumbnail

FHSU Forsyth Library Renovation

The MCP Group

The work includes site demolition, selective demolition, earthwork, erosion control, site concrete, brick pavers, decorative fences, landscaping & irrigation, site utilities, cast-in-place concrete, masonry, stone, stone cleaning, cast stone, structural steel, decorative stairs & railings, architectural woodwork, air barriers, EPDM roofing, (..)

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Wyndham Echo Round Rock, TX

The MCP Group

Bid Due Date | February 20, 2024 12:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)

article thumbnail

Reaching a new level of sophistication with panelized construction

Construction Specifier

Construction of wall, floor, and roof systems offsite has multiple advantages, including compressing the project schedules, reducing site labor and waste, improving consistency and quality control, and increasing safety for workers. Just about any finish that can be applied to a floor or wall surface can be used on the panels.

article thumbnail

Echo Suites – Pasadena, TX

The MCP Group

Bid Due Date | August 31, 2023 2:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)

article thumbnail

Oregon architect’s HQ: Northwest’s first ‘all-wood’ mass timber project

Construction Specifier

The building represents a structure made almost entirely of wood with all-electric, refrigerant-free, hydronic heating, and cooling systems. The building also incorporates all-electric, refrigerant-free, hydronic heating and cooling systems. The interior of the building shows the exposed wood walls. Photos courtesy Lara Swimmer.

article thumbnail

Echo Suites – Fort Worth, TX

The MCP Group

Bid Due Date | July 19, 2023 2:00 PM Project Description New Construction of a 4 story wood framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)