6 showcase hotel construction projects
The Korte Company
SEPTEMBER 7, 2018
The shorter structure allowed for the use of light gauge prefabricated metal framing and eliminated the need for separate metal studs on load-bearing walls. The grounds were enhanced with the addition of concrete paths, handicap ramps and improved exterior lighting. The Army agreed to our design for a seven-story lodge.
Let's personalize your content