article thumbnail

6 showcase hotel construction projects

The Korte Company

The shorter structure allowed for the use of light gauge prefabricated metal framing and eliminated the need for separate metal studs on load-bearing walls. The grounds were enhanced with the addition of concrete paths, handicap ramps and improved exterior lighting. The Army agreed to our design for a seven-story lodge.

article thumbnail

Find About the Latest News on Steel Used to Build the UK Wedgetail Facility, the Dispute Over UK Parliament’s £22bn Renovations, Innocrete3d Launches UK 3dcp, and a Timber in Construction Roadmap Should Start With Education

UK Construction Blog

Along with steel, the British government obtained 7,000-square-metre (75,000-square-foot) cladding for the E-7 maintenance and mission systems training buildings. McLaughlin & Harvey reported that the 100-million-pound ($124 million) mission systems training facility is being built next to Lossiemouth’s P-8A Poseidon hangar.