article thumbnail

Renovated historic site gets structural and mechanical overhaul

Construction Specifier

Renovation work included significant reinforcement of the original structure, restoration of historic interior trim, and upgrading modern mechanical and fire safety systems through original masonry walls. Many of the original doors have been restored and fixed in place on unit walls and throughout hallways.

article thumbnail

Moresby Hall A595 Roadway Embankment Repair Project  

Civil + Structural Engineer

The goal was to rebuild the roadway embankments and integrate a new drainage system, thereby facilitating long-term improvements and reducing maintenance needs for the A595. Two site enhancement locations were established, one on each side of the A595 roadway.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

The Full Scale House 3D Printed by Robotic Arms Completes in Muscatine 

Civil + Structural Engineer

Slashing Costs by Tens of Thousands, RIC Technology Revolutionizes 3D Construction Muscatine, Iowa – The second 3D-printed house in Muscatine has completed construction by the leading 3D construction company Alquist 3D, powered by RIC Technology’s cutting-edge robotic arm based 3D printing system.

article thumbnail

Light at the End of the Tunnel

Civil + Structural Engineer

In fact, the storm drain system is about 100 years old. Minneapolis development combined with increased rainfall brings more water into the system, which heightens the pressure on the tunnel. To overcome this, Curb Roller Manufacturing devised a custom offset drive system as well as an operator/finishing platform.

article thumbnail

Concrete Wall Panels Help Build Noncombustible Homes

The Pro Builder

Concrete Wall Panels Help Build Noncombustible Homes qpurcell Wed, 02/21/2024 - 11:24 As California’s wildfires rage and major home insurers pull out of the state , the rising risk of home fires isn’t being helped by conventional construction, says Scott Long. When one wood-frame home goes up, others nearby quickly follow, he says.

article thumbnail

SME house builders demand action from “anti-building” Tories

Construction Enquirer

Smaller house builders are facing a raft of problems including: The collapsing planning process where under-resourced local authority planning departments can take years to process applications Planning reform. From ‘red line’ outline planning permissions, it would take six to eight weeks to get the first spade in the ground.

article thumbnail

New BJC Health Tower Breaks Ground in St. Louis

Civil + Structural Engineer

Louis area, Barnes-Jewish Health Systems (BJC) undertook a long-term, campus wide renewal project. Because of the ever-evolving expectations for new healthcare facilities to provide visitors and patients with optimal comfort, the plans for the new tower included unique yet challenging design elements.